How To Adjust The Cam Of Blister Packing Machine?
Aug 04, 2022
What is the installation sequence of the valve cam of the blister packaging machine on the shaft? First, from the inside to the outside, it is the traction and clamping cylinder cam, the back-stop cylinder cam, the forming blowing cam and the forming cylinder cam. When the return position of the heat sealing cam linkage heat sealing mold is very low, the valve cam is installed according to the position.
When the traction mechanism of the tablet blister packaging machine is in the cam traction clamping cylinder, the mechanical control valve opens a little earlier than the cam. When the traction machine is stationary, the backstop cylinder is clamped back to its original position. After the molding die and the blowing die are closed, the blowing cam opens the mechanical control valve to blow molding. The rise of the forming cylinder should be synchronized with the heat sealing cam.
The whole process of adjusting the cam of the blister packaging machine is: after the traction clip clamps the plastic sheet, the plastic sheet positioning cylinder is released immediately, the manipulator starts to pull, and after the manipulator stops in place, the plastic sheet positioning cylinder presses the plastic sheet, the forming cylinder and punching The cutting work is lifted, the traction clamping is released, the traction manipulator is retracted, the forming cylinder and the blanking are lowered to the original position, which is the completion of one cycle.